ETE Basic Power Cage 4-6 Weeks Lead Time Due To High Demand

ETE Basic Power Cage 4-6 Weeks Lead Time Due To High Demand

$1,259.00

4-6 Weeks Lead Time Due To High Demand
ETE Basic Power Cage
Made In The USA

Clear

Description

4-6 Weeks Lead Time Due To High Demand
ETE Basic Power Cage
8′ Tall
3″ X 3″ Tubing, 11 Gauge Steel
Fully Welded Main Frame Unlike Power Rack 2.0 That Is Bolt Together.
Multi Grip Pull Up Bar For Front, Single Pull Up Bar Rear
2 Vertical Bar Holders
3″ X 3″ Safety Spotter Arms Lined With UHMW Plastic
Pair J-hooks Lined With UHMW Plastic
Made In The USA

Built To Order 4 Week Lead Time.

ETEColorOptions

Reviews

There are no reviews yet.


Be the first to review “ETE Basic Power Cage 4-6 Weeks Lead Time Due To High Demand”

You've just added this product to the cart: